Chilhowee Hydroelectric Development

(Tapoco Hydroelectric Project MPS)

Tallassee, Tennessee

Bigger map

Street Address: 6102 TN 129

Locality: X

Town/City: Tallassee

County: Blount

State: Tennessee

Zipcode: 27542

Hotels near Chilhowee Hydroelectric Development

We don't have any photos of this property yet. Why don't you be the first to upload one?

Reference Number: 4000546

Inclusion Criteria Code A: The property is associated with events that have made a significant contribution to the broad patterns of American history.

Certification Date: May 27, 2004

Property Classification: District

Area of Significance: Industry

Significance Level 4: Local

Key Date: 1957

Other Significant Dates: 1950-1974

Architectural Style: Other architectural type; Functional

Historic Function Category: Industry/Processing/Extraction

Historic Function Detail: Energy Facility

Current Function Category: Industry/Processing/Extraction

Current Function Detail: Energy Facility

Chilhowee Hydroelectric Development, Tallassee, Tennessee is a grade 4 historic property. The property is associated with events that have made a significant contribution to the broad patterns of American history.
comments powered by Disqus